Aryshire Drive Culvert Replacement
When the City of Dublin needed an existing 144” culvert replaced with a new Con-Span Bridge System, within a neighborhood at the prestigious Muirfield Village Golf Course, attention to detail was paramount. This project required an H-Pile and Lagging system to be utilized to shore an existing pedestrian tunnel that was directly adjacent to the existing culvert that was to be replaced. Communication with the nearby neighbors, as well as with the City, was of the utmost importance, especially during the pile driving process given the inherent noise and vibration associated with this phase of construction. Even while working in tight construction limits, and around existing public utilities, the schedule was met and the project was completed successfully.